Quick answer
First verify the electronic record and status in SIHALAL, then follow current BPJPH requirements: a loss statement, proof of the certificate-holding entity, authorization for the handler, and a published loss notice or declaration in the accepted form. If the information is correct, a reissued document or the verifiable electronic certificate may be used. If a name or address change is also pending, complete that first so the replacement is not already outdated.
Detailed explanation
Replacement document list
Replacement is not recertification, but the accepted document set follows current requirements:
- A sealed loss statement giving the certificate number and circumstances.
- The business license copy and the handler authorization and identity proof.
- The published loss notice or written undertaking where required.
- A verification screenshot of the electronic certificate and the active product list.
- For an agent, the power of attorney states the scope and period.
Process order
- Check whether a change is pending and combine cases if needed.
- File online and pay the official charge according to current standards.
- On collection, verify that the number and validity match the original record.
- Multi-site companies check every certificate so linked site documents are not missed.
Shipping in the interim
Exporters in Tianjin can support clearance with the verifiable SIHALAL record and send the number to the importer for checks. Do not alter or stitch certificate images; if the electronic record and printed data diverge, pause use and request verification rather than shipping on a guess.
Applying this answer to your plant: three checks
A FAQ answer is general. Before acting on it, check your own situation to find documentation gaps early.
Match raw materials and lines
Map the raw materials, additives and process steps mentioned in the answer to your formula, suppliers and lines. Shared lines need changeover and cleaning validation; dedicated lines need segregation records.
Check documents against batches
Confirm that origin certificates, slaughter or purchasing records, test reports and intake ledgers can be traced by batch. Names, specifications and process descriptions must match the application.
Align with the shipping gateway
For your actual route through Tianjin, Dalian, Manzhouli or Khorgos, check certificate product scope, invoice description, packing batches and cold-chain temperature records to avoid inconsistent documents.
These are general checks, not a certification conclusion. Document requirements and certification decisions follow Indonesia’s BPJPH rules and the formal assessment.
Still have questions?
Tell our consultants your product category and target market, and we will help you map out the path and the documents required.