Quick answer
The key is using the lot number to lock together scheduling, cleaning and production: the schedule names the batches before and after each halal run, changeover cleaning follows the SOP and is verified before start, and the lot number runs through material issue, production, warehousing and dispatch. A cannery in Ningbo concentrates halal production on two fixed days per month and files batch records with cleaning sheets, so one lot reconstructs the whole timeline.
Detailed explanation
Lot-number coding rule
The lot number can include product code, production date and shift, with a fixed prefix for halal batches so they are clearly distinguishable from non-halal lots on the same equipment. The rule is written into SJPH documents and used on every form; warehouse staff must not invent abbreviations.
Time-isolation procedure
- Fix the sequence around halal batches during scheduling
- After the previous batch, clear the line, materials and tools
- Clean per the SOP and verify by sampling or visual check
- Halal coordinator signs the release
- Record the lot on issue, production, packing and stock-in forms
Documents linked by one lot
Material requisition, dosing, key-process, cleaning, release, stock-in and dispatch documents should all carry the same lot number. A break anywhere makes the traceability chain incomplete.
Traceability drills
Each quarter pick one lot and gather the full file set from raw-material certificates to customer dispatch within two hours. Back-signed forms, alterations or impossible time sequences found in the drill are treated as internal-audit nonconformities.
Applying this answer to your plant: three checks
A FAQ answer is general. Before acting on it, check your own situation to find documentation gaps early.
Match raw materials and lines
Map the raw materials, additives and process steps mentioned in the answer to your formula, suppliers and lines. Shared lines need changeover and cleaning validation; dedicated lines need segregation records.
Check documents against batches
Confirm that origin certificates, slaughter or purchasing records, test reports and intake ledgers can be traced by batch. Names, specifications and process descriptions must match the application.
Align with the shipping gateway
For your actual route through Tianjin, Dalian, Manzhouli or Khorgos, check certificate product scope, invoice description, packing batches and cold-chain temperature records to avoid inconsistent documents.
These are general checks, not a certification conclusion. Document requirements and certification decisions follow Indonesia’s BPJPH rules and the formal assessment.
Still have questions?
Tell our consultants your product category and target market, and we will help you map out the path and the documents required.