Quick answer
Yes. The certificate binds holder to entity and site; entities in one park file separately, and a shared address does not block intake if each side's workshop, warehouse and equipment are distinguishable. Tenants around Hefei, Anhui use partitions, dedicated passages and independent signs. Where water lines, cold storage or a line is shared, zoning, time separation and cleaning verification must be shown; otherwise retrofit before filing.
Detailed explanation
Preconditions on a Shared Site
- Independent entities: license, account and holder are separate, with no borrowing.
- Divisible space: workshops, material and finished-goods stores and dispatch zones have clear boundaries.
- Identifiable equipment: utensils, lines and containers are marked, not mixed between tenants.
- Non-crossing routes: staff, material and waste paths avoid mutual contamination. With these in place, one address can still form separate review units.
Boundaries for Separate Filings
- The lease and floor plan mark exclusive and shared areas as annexes.
- For shared cold rooms, lifts or water rooms, agree usage slots and cleaning duties.
- Where a line cannot be split, run time-separated production with verified cleaning and keep evidence.
- One tenant leaving does not affect the other's number, but layout changes need assessment.
Written Checks Before Moving In
Before signing, confirm whether partitions, dedicated storage and signs can be added. Put equipment lists, drainage and pest-control duties with neighbors into property documents. These papers are used directly in the audit to check routes, and beat verbal descriptions.
Applying this answer to your plant: three checks
A FAQ answer is general. Before acting on it, check your own situation to find documentation gaps early.
Match raw materials and lines
Map the raw materials, additives and process steps mentioned in the answer to your formula, suppliers and lines. Shared lines need changeover and cleaning validation; dedicated lines need segregation records.
Check documents against batches
Confirm that origin certificates, slaughter or purchasing records, test reports and intake ledgers can be traced by batch. Names, specifications and process descriptions must match the application.
Align with the shipping gateway
For your actual route through Tianjin, Dalian, Manzhouli or Khorgos, check certificate product scope, invoice description, packing batches and cold-chain temperature records to avoid inconsistent documents.
These are general checks, not a certification conclusion. Document requirements and certification decisions follow Indonesia’s BPJPH rules and the formal assessment.
Still have questions?
Tell our consultants your product category and target market, and we will help you map out the path and the documents required.